Good creditworthiness
Sustainability Index Logo
Sustainability index award

Test group service description

STANDARD TEST

To all electrical installations controlled, standard tests are performed. The Test report is completed during the Test. The Test includes:

1. VISUAL INSPECTION:

  • Are the mechanical parts of the panel adequately fastened, is there any no scratches, any paint defects or other damage to the panel;
  • Panel seals sealed and not damaged;
  • Provision of corrugated spare length on doors and other moving parts;
  • Does the main switch in the position “on” provides protection against opening the door;
  • Is the protection against activation of the main switch provided;
  • Is the panel meets IP2X (Finger control) requirements.